After months of hard work, we got the kitchen/bathroom and 
foyer additions framed and sheeted.

This is how it looks from the south, with the 
kitchen/bathroom windows oriented to look down 
the valley over the hay fields. 

You can see the concrete footings in front, ready for the 
22' hexagonal deck to be placed on top. 

We replaced the 5 triangles and 3 rectangular pieces, 
closing in the space that will one day be a sliding 
door and windows.

This is a view from the other side of the dome, 
which shows the small entryway.

 
Here is Paul placing the large, heavy-duty tarp gifted to us 
from Barnaby Killam of Red Flag design over the dome 
to keep it relatively dry until we can come back and roof it.
  
We can't wait to get back to it and see this building with a
 roof, windows and doors, the awning over the deck, the 
deck itself, not to mention the septic system, electrical, 
insulation, interior, and the mezzanine.... 

Wait for it!

Thanks again to all the suport from Ross Hill and Jane Irwin 
in helping this project come to life. 
Also many thanks to all the friends, family and neighbors 
who pitched in this year.